IPOA (through Metacon) supplied and installed steel structures, steel sheet roofs, precast concrete and sandwich elements for the project. The delivery gave the building the robustness and flexibility required in a modern logistics facility.
The logistics center was completed in less than a year, despite demanding winter conditions, and is ready to meet the future needs of Posten and Bring.
Place
The forest of the city, Stokke
Year of construction
2018
Size
8,200 m²
Customer
Concrete mastHæhre Buskerud-Vestfold



